Rain Bird PAR+ES Installation Manual - Contents
Contents
Introduction 1
System Configuration 1
Parts List and Tools Required 1
Installation Checklist 1
Mount Controller Pedestal on Poured-
In-Place Concrete Pad 2
Install L-Bolts in Mounting Template(s) 2
Concrete Pad Requirements 2
Before Pouring Concrete Pad 3
Pour the Concrete Pad and Mount the Pedestal 3
Install Power Wiring (120, 220 or 240
VAC) 4
Install Junction Box 4
Surge Arrestor Installation 4
Connect AC Power Supply 5
Connect AC Power 5
Connect Power Wires and Surge Arrestor Wires 5
Controller to Controller Connections
Overview 6
Install MAXI 2-Wire Interface Board 7
Cable Connections 7
2-Wire Path Connections 7
Install The +LINK Radio/Modem Kit 8
+LINK Power Transformer Installation &
Connection 8
+LINK Interface Board Installation 8
Radio Modem Kit and Antenna Panel Installation 9
PAR+ES Controller
Installation Manual
CAM Link Installation Flow Chart 10
Basic PAR+ES Field Wiring 11
Decoder Controller 12
Decoder Design 12
General Installation Instructions 13
Decoder Controller Installation 13
Field Surge Protection for Decoders 14
Install an Additional Output Station
Module (OSM) 15
Upgrade Kit Installation 16
Sensor Installation 17
Appendix
Controller Grounding System
Installation 18
Ground Resistance 18
Installation Requirements 18
Grounding System Designs 19
Enhanced Ground System 20
635778 Rev B (PAR+ES installation manual (1of2 ENG)) source.indd 2
9/2/2008 4:09:27 PM