Ravelli Pompeii Owners & Installation Manual - Installation
37
32
30
2.
Installation
2.1
Dimensions – Pompeii
Freestanding
Refer to Safety T
SR 0484 for all clearances to combustible.
est
2.2
Clearances &
Minimum clearances shown are in millimetres. All Ravelli
a guide only. Refer to the Installation and Operation Manual supplied with every Ravelli
Pellet Fire or
if in doubt, consult your Pellet
e
ri
F
s
n
o
it
u
l
o
S
Retailer.
B
J
H
A
E
External Flue
J
J
F
B
I
F
E
Pompeii Pellet Fire
Clearance to Combustibles
B
C
A
E
D
G
F
B
F
G
E
Internal Flue
Location
Dimension
(mm)
A
B
150
C*
D
E
F
0
1 0
G*
H
I*
J*
50
n/a
50
0
0
1
50
25
0
1 0
100
Freestanding
Clearances
* from shielded flue
* 75mm to unlined flue
Note: AS/NZS 2918
requires a minimum
of 100mm clearance
for any side requiring
access.
Note: These are
minimum clearances to
combustibles. Actual
installation distances
may be greater.
test 05/1185.
1133
581
Specifications were correct at time of printing but may alter, and those detailed below should be used as