Raychem h910 Installation Instructions Manual - page 6
6
Installation Instructions
H910 Splice and Tee Kit
17a
For all installations
except gutter/downspout
17b
For H612 and H622 gutter/downspout installations
16a
For H612 and H622 heating cables only
16b
For H311, H611, and H621 heating cables only
• Shrink the tube completely. Start at end
farthest from the cap and work toward the
open end.
• Keep heating after tube has shrunk, to melt
adhesive and mastic inside tube. Total heating
time should be about 5 minutes.
• Shrink the tube completely. Start at end
farthest from the cap and work toward the
open end.
• Keep heating after tube has shrunk, to melt
adhesive and mastic inside tube. Total heating
time should be about 5 minutes.
• Immediately after shrinking,
pinch the end of the tube with
needle nose pliers until the
end stays sealed; this
normally takes
10 seconds.
• After the connection has cooled, fold
over the connection and fasten it with
the third cable tie.
• Secure heating cable with downspout
hanger (H904).
• Fasten clamp tie to center of connection.
• Use a hammer, nail, and clamp tie to secure
connection and keep it off the gutter bottom
as shown.
• Immediately after shrinking,
pinch the end of the tube with
needle nose pliers until the
end stays sealed; this
normally takes
10 seconds.
Caution:
To avoid burns, allow
heated sections to cool
before touching.
Caution:
To avoid burns, allow
heated sections to cool
before touching.
Secure end of
connection to
heating cable.