Sussman ES Installation, Operation And Maintenance Manual

Manual is about: Boilers

Summary of ES

  • Page 1

    Table of contents dimensional information and component identification . . . . . . . . . . . . . . . . . 2 dimensional & clearing specifications. . . . . . . . . 3 wiring diagrams . . . . . . . . . . . . . . . . . . . . . . . . . 4-7 installation piping . . . . . . . . . . . . . . . . . . . . . . . ...

  • Page 2

    Dimensional information & component identification 2 installation, operation & maintenance manual _______________________________________ water steam model h w l inlet outlet _______________________________________ es 12, 18; hu 40–55 36" 20" 28" 1/2” npt 1/2”npt ____________________________________...

  • Page 3

    3 dimensional & clearance specifications steam outlet operating pressure control high limit pressure control pressure gauge safety valve liquid level control water feed inlet f e l d a b e r front left drain valve on/off switch gauge glass assembly height width length side elevation front elevation ...

  • Page 4

    H1 h3 h5 h7 fb1 fb2 fb3 fb4 field wiring factory wiring pilot light 480v 120v h2 h4 h6 h8 to control circuit heating elements transformer (optional) tb 1 tb fb c h l1 l2 l3 g power fuses (see note 2) contactors c1 c2 c3 c4 single phase main power supply l1 l2 g t1 terminal power block (see note 1) t...

  • Page 5

    Wiring diagram control circuit relay field wiring factory wiring pilot light l operating pressure control aux lwco pc board manual reset pilot light l1 g nc com no l2 high limit pressure control liquid level control on-off switch control terminal block 120v 1ph input l n to probe solenoid valve cont...

  • Page 6

    Wiring diagram control circuit relay field wiring factory wiring pilot light l operating pressure control proportioning pressure control 135 ohm com sequencer high limit pressure control liquid level control on-off switch control terminal block 120v 1ph input l n l1 l2 solenoid valve c1 c2 c3 c4 con...

  • Page 7

    Wiring diagram control circuit 7 es electric boilers with automatic blowdown system relay field wiring factory wiring pilot light pilot light l operating pressure control high limit pressure control liquid level control on-off switch control terminal block 120v 1ph input l n 7-day 24-hr timer time d...

  • Page 8

    Refer to national and all applicable local codes for specific installation requirements. 1. The boiler should be mounted on a solid, level foundation. 2. The boiler should be located with suitable clearances, refer to page 3 and code requirements. Note: allow minimum of 21 inches clearance in front ...

  • Page 9

    9 all electrical wiring must be performed by a qualified electrician in accordance with national and local electrical codes. Assure that the power voltage and phase being supplied to the boiler matches the power voltage and phase of the boiler. Connecting incorrect power supply can damage boiler com...

  • Page 10

    Pressure controls, operation and testing note:all boilers are provided with one high limit pressure control and at least one operating pressure control. 1 . The high limit pressure control is equipped with a manual reset feature. There is no subtractive differential scale with this type of control 2...

  • Page 11

    Operation with main disconnect “off” tighten all electrical connections before energizing boiler to prevent arcing, carbonizing of contact and/or overheating 1. Set the desired operating pressure and differential pressure on the operating pressure control. 2. Set the high limit pressure control. (re...

  • Page 12

    12 installation, operation & maintenance manual digital timer - operation instructions to set time & day of clock 1. Press menu 2. 24h am or pm blinking, press + or – to select, press ok 3. Hour (12:00) blinking, press + or – to select, press ok 4. Minute (12:00) blinking, press + or – to select, pr...

  • Page 13

    Maintenance 24-hour and 7-day time switches 13 hazard of electric shock. Disconnect all electrical power before working on boiler. S ussman electric steam boilers are designed for years of trou- ble-free performance. To establish a good preventative mainte- nance program, we suggest that the facilit...

  • Page 14

    Installation, operation & maintenance manual standard equipment for es & hu optional equipment 14 auxiliary low water cut off • for model es & hu boilers pn es81017mr (with manual reset). Senses water level electronically using a resistance probe. When a low water condition is detected, the contacto...

  • Page 15

    Optional equipment (cont.) 15 vacuum breaker systems • for model es boilers pn es89369 a vacuum breaker will prevent a boiler from flooding as a result of the steam condensing internally and creating a vacuum after boiler shutdown. The breaker allows air to enter the boiler shell breaking the vacuum...

  • Page 16

    Condensate return systems 16 notes: 1. Motor/pump is closed - coupled design 2. Pump capacity as follows: 3. Normal cold water level approximately 1/2 to 5/8 up to visible part of gauge glass. Installation, operation & maintenance manual models 38083v & 38084v model 38083v ___________________ psig h...

  • Page 17

    17 blowdown separator tanks- specifications and data models bdt-asme 36, 42, 48, 54 installation, operation & maintenance manual d a h g the sussman separator design incorporates a water seal at the outlet which permits the operator to introduce cold water from the bottom to mix with the hot water a...

  • Page 18

    Specifications steam gauge pressure/ temperature chart 18 installation, operation & maintenance manual __________________________________________ boiler bhp lbs/hr 3-ph model no. Kw rating steam** volts*** amps __________________________________________ 208 34 es-12* 12 1.22 36.2 240 29 480 15 _____...

  • Page 19

    Sizing 19 use the following table to determine kw boiler rating when steam load and feedwater temperatures are known. ___________________________________________________________________ feed water 0 2 10 15 25 40 50 75 100 125 150 ( f˚) _______________________________________________________________...

  • Page 20

    Important note: read all warnings and instructions before performing installation or maintenance. Safety glass- es and gloves should be worn at all times when working with or examining water gauge glass and connections. Pressure in generator to be at zero before proceeding. Improper installation or ...

  • Page 21

    Gauge glass installation - use and care 21 do nots • do not use glass if it contains any scratches, chips, or any other visible signs of damage. • do not reuse any tubular glass or glass packings. • do not subject gauge glass to bending or torsional stresses. • do not over tighten glass packing nuts...

  • Page 22

    Element replacement 22 installation, operation & maintenance manual read instructions completely before starting work before installing your new elements be sure the mcdonnell miller low water cut-off and aux. Low water cutoff (if sup- plied) is operating properly. The float chamber and lower equali...

  • Page 23

    For optimum results, the feedwater supply should be tested prior to initial start-up. If the mineral content exceeds the following recommended limits, various external treatment processes (water softener, reverse osmosis, etc.) may be used to correct the problem. Note: an analysis of the on-site boi...

  • Page 24

    A division of sussman-automatic corporation 43-20 34th street, long island city, ny 11101 • (718) 937-4500 1-800-238-3535 • fax: (718) 937-4676 • email: seb@sussmancorp.Com www.Sussmanboilers.Com pur 101137 4.13 m a d e i n u s a.