Venmar CPM SERIES Installation Instructions Manual - 11. Connect Wiring
11. CONNECT WIRING
Connect cable into wiring box using provided wire connectors.
Connect wires as follow: BLACK to BLACK, WHITE to WHITE and GREEN
or BARE wire under ground screw. DO NOT FORGET TO CONNECT THE
GROUND. Reinstall wiring cover.
WARNING
Risk of electrical shock. Electrical wiring must be done by qualified personnel in accordance with all
applicable codes and standards. Before connecting wires, switch power off at service panel and lock
service disconnecting means to prevent power from being switched on accidentally.
!
HE0059
Position the power pack below the installed custom hood. Insert the house wiring cable through the wire clamp previously
installed in step 8. Tighten the wire clamp to secure the cable.
Install 10” damper inside the vertical ductwork that will be attached to power pack. Do
not install in a horizontal ductwork or it will not open and close properly. Remove
shipping tape if present. To optimize airflow and quiet sound, position the damper at
least 17” above the top of the CPM2 power pack; or as far as the duct run will allow (see
figure beside). Secure the damper to the duct with 3 no. 8 sheet metal screws (not
provided). Check to make sure damper opens and close freely. Seal all joints with duct
tape to eliminate air leaks.
17
”
min.
HJ0017A
10. INSTALL THE ADAPTER AND THE DAMPER (CPM2 MODEL ONLY)
- 7 -
Using (2) no. 8 x 3/8” screws from parts bag, assemble the adapter on the top of the
power pack. Seal all joints with duct tape to eliminate air leaks.
HJ0026
M
OUNTING
S
CRE
W
L
OCATION