Venmar CPM SERIES Installation Instructions Manual - 13. Install The Power Pack
- 9 -
CPM2 M
ODEL
For each blower, using a 5/16” socket, secure the blower to the inner top of the power pack
through the front and rear brackets with all blower mounting screws (previously removed
in step 12).
HD0297
For each blower, slide it to engage its flanges in both retaining brackets.
NOTE: Both blowers are identical and can be mounted on either side of the power pack.
B
LOWERS
F
RONT
B
RACKET
B
LOWERS
R
EAR
B
RACKET
HD0298
14. REINSTALL THE BLOWER(S)
HD0282
R
IGHT
S
IDE
M
OUNTING
S
CREW
L
OCATION
Using a 5/16” socket, secure the blower to
the inner top of the power pack with all blower
mounting screws (previously removed in
step 12).
HD0269
L
EFT
S
IDE
M
OUNTING
S
CREW
L
OCATION
Slide the blower to engage its flange in the
retaining bracket.
HD029
3
CPM1 M
ODELS
13. INSTALL THE POWER PACK
Using provided no. 8 x 1/2” chrome plated screws, install the power pack inside
the custom hood. Start with 2 screws on front corners, then use 4 screws for
sides and use the last one to finalize securing the front power pack. (See figure
beside for mounting screw specific locations.)
Make sure the adapter/damper (or the adapter) enters the ducting. When there
is access to the top of the power pack, seal connections with duct tape.
CAUTION
Take care not to kink ducting when installing the power pack.
HH0102A