10
16.
Locate the Press Cable (49). Slide the Cable
onto the hook on the Left Arm (7).
17. Attach the Pulley Arm (38) to the Upright (3) with
an M10 x 78mm Bolt (54) and an M10 Nylon
Locknut (68).
Do not overtighten the Locknut;
the Pulley Arm must be able to pivot easily.
Wrap the Press Cable (49) over a 90mm Pulley
(34). Attach the Pulley and a pair of Pulley
Covers (35) to the indicated side of a Pulley Arm
(38) with an M10 x 52mm Bolt (52) and an M10
Nylon Locknut (68).
Make sure the large tabs
on the Pulley Covers are in the indicated posi-
tion.
15. Attach the end of the High Cable (50) to the
Small “U”-bracket (11) with an M8 Washer (71)
and an M8 Nylon Locknut (69).
Note: Do not
completely tighten the Locknut; it should be
threaded onto the Cable so that two threads
show past the Locknut, as shown in the inset
drawing.
Attach the Small “U”-bracket (11) to the Weight
Tube (12) with an M8 x 45mm Bolt (60) and an
M8 Nylon Locknut (69).
Do not overtighten the
Locknut; the Weight Tube must be able to
pivot in the Small “U”-bracket.
14. Wrap the High Cable (50) over a 90mm Pulley
(34). Attach the Pulley and a pair of Pulley
Covers (35) to the bracket on the Top Frame (4)
with an M10 x 52mm Bolt (52) and an M10 Nylon
Locknut (68).
Make sure the small tabs on the
Pulley Covers are on bottom.
68
50
34
35
35
4
52
14
11
71
60
69
12
15
7
54
3
35
34
68
16
17
50
69
49
Hook
49
38
52
Large
Tab