Installation
Existing Hot Water Heat
A Water to Water Heat Transfer Unit (0020-052) is used to connect to an existing hot water boiler system.
NOTE:
Any changes that are made to an existing boiler
should be done by a qualified plumber and follow all state
and local codes.
The Inline Filter and Fill Valve Assembly (0020-275) must be installed in the Cold Water
Return Line before the line exits the building. It should be placed so that a garden hose can
be connected between a domestic water supply and the Fill Valve.
Inline Filter and Fill Valve Assembly
Hot Water Supply from
WoodMaster Plus
Cold Water Return to
WoodMaster Plus
Existing Heat
Zone Return
WoodMaster Water to
Water Heat Transfer Unit
Circulating Pump
for Existing Hot
Water Heating
System
Existing Hot
Water Boiler
Cold Water Return from
Heat Exchanger
Domestic Water
Supply for filling
boiler
Cold Water
Return to
WoodMaster Plus
Auger Assembly
Place the auger carriage in the furnace, insert the
center auger through the auger tube and align with
the stub shaft on the back of the carriage.
Place the auger cap over the auger tube and align the center auger
shaft with the hole in the auger cap. The Auger cap should com-
pletely slide on tube. If this does not happen, the center auger is not
all the way on stub shaft. Rotate auger, while pushing in, to insure
the cap and auger are installed properly. Tighten the auger cap.
Insert the grate and place over
the top of auger carriage.
NOTE: The Ash Auger and grate
must be removed after each
heating season for cleaning and
maintenance .