Zenith XBV243 series Service Manual - Mechanism - Vcr
Other manuals for XBV243 series:
Installation And Operating Manual, Installation And Operating Manual, Installation And Operating Manual
of
110
MECHANISM - VCR
VR168 - 923-03485
4-11
D35E COMBO - SERVICING
(A)
(B)
(C)
(S7)
Arm Assembly Idler Jog
Base Loading
Base Tension
Chassis
(D)
Fig. A-9
(Fig.
A-9-1)
(Fig.
A-9-2)
(Fig.
A-9-3)
BASE LOADING (FIG. A-9-1)
1) Remove the Screw (S7).
2) Lift the Base Loading.
BASE TENSION (FIG. A-9-2)
1) Carefully pry up Tab (A) to clear the embossed tab on
the chassis.
2) Turn the Base Tension counterclockwise and lift.
ARM ASSEMBLY IDLER (FIG. A-9-3)
Pinch (B) and (C) as shown in Fig. A-9-3, and lift.
NOTE: When disassembling, be careful not to catch part
(D) on the Chassis (See the Inset).