    Installation guide a-dec 500 12 o’clock delivery system 86.0466.00 rev e before you begin before starting the installation: • check with local building and code authorities about installation requirements. They differ from state to state and internationally. • check that a manual air shut-off valve ...

  • Page 2

    A-dec 500 12 o’clock delivery system installation guide 2 86.0466.00 rev e install the floor mount install the faceplate (a-dec inspire 591 treatment center only) you must install the faceplate on the a-dec inspire 591 treatment center before installing the mount. 1. Slide the faceplate into positio...

  • Page 3

    A-dec 500 12 o’clock delivery system installation guide 86.0466.00 rev e 3 attach the mount to a non-concrete floor 1. Drill the mounting holes: (1) drill 3/8" (9.5 mm) diameter holes 3-1/4" (82.5 mm) deep. (2) remove debris from the holes. 2. Use four washers and 1/2" x 4" lag screws to secure the ...

  • Page 4

    A-dec 500 12 o’clock delivery system installation guide 4 86.0466.00 rev e plumb the delivery system 1. Position the tubing between the floor mount bracket posts. Route the vacuum line last. Ensure all tubing is completely tucked down between the posts. 2. Route the tubing and connect matching tubin...

  • Page 5

    A-dec 500 12 o’clock delivery system installation guide 86.0466.00 rev e 5 to install the foot control on a wall: 1. Drill a 2-1/8" (54 mm) hole. 2. Install the tubing through the grommet. Push the grommet and tubing through the wall plate. 3. Attach the cover plate to the wall. Use fasteners provid...

  • Page 6

    A-dec 500 12 o’clock delivery system installation guide 6 86.0466.00 rev e attach and level the round worksurface 1. If necessary, remove the screws from the threaded standoffs in the metal plate underneath the worksurface. 2. Position the round worksurface on the worksurface support housing. Align ...

  • Page 7

    A-dec 500 12 o’clock delivery system installation guide 86.0466.00 rev e 7 test the unit 1. Fill the water bottle. Use the fill procedure specified by the dental staff. 2. Turn on the master toggle. 3. Check the air pressure of the unit. It should be at 75 psi ± 5 psi. 4. Check for air and water lea...

  • Page 8

    A-dec 500 12 o’clock delivery system installation guide 8 86.0466.00 rev e 6. Adjust the water coolant flow to the customer’s preference (normally 1-2 drops per second). ○ turn the adjustment key to the right to decrease flow. ○ turn the adjustment key to the left to increase flow. Handpieces—air co...

  • Page 9

    A-dec 500 12 o’clock delivery system installation guide 86.0466.00 rev e 9 touchpad setting adjustments a-dec touchpads control multiple chair and delivery system functions: • standard touchpad: chair, light, and cuspidor controls. • deluxe touchpad: standard touchpad settings plus setting for two m...

  • Page 10

    A-dec 500 12 o’clock delivery system installation guide 10 86.0466.00 rev e manual operation you can use the touchpad buttons to manually operate: • chair positions • cupfill • bowl rinse • dental light • a-dec relay • handpiece settings (deluxe touchpad only) chair positions: the chair positioning ...

  • Page 11

    A-dec 500 12 o’clock delivery system installation guide 86.0466.00 rev e 11 factory presets chair positioning, light functions, cuspidor functions, handpiece behavior and speed are factory preset. Table 1 lists and defines the standard touchpad factory presets. Table 1. Standard touchpad factory pre...

  • Page 12

    A-dec 500 12 o’clock delivery system installation guide ÍvÈ.Ç$bÈ.00ÃÎ 86.0466.00 rev e copyright 2016 a-dec inc. All rights reserved. Igporeven11 a-dec headquarters 2601 crestview drive newberg, or 97132 usa tel: 1.800.547.1883 within usa/can tel: +1.503.538.7478 outside usa/can fax: 1.503.538.0276 ...