A-Dec 500 Installation Manual - page 4
A-dec 500 12 O’Clock Delivery System Installation Guide
4
86.0466.00 Rev E
Plumb the Delivery System
1. Position the tubing between the floor mount bracket
posts. Route the vacuum line last. Ensure all tubing
is completely tucked down between the posts.
2. Route the tubing and connect matching tubing colors
and patterns; for example, yellow dashed tubing to
yellow dashed tubing. Refer to the flow diagram
located either under the round worksurface or inside
the control center housing.
3. For the A-dec 541, locate the hole directly under the
control center and pull the covers away from each
other to remove them.
Connect the Vacuum
1. Apply adhesive (not provided) to the vacuum
connection.
2. Connect the vacuum line to the vacuum stub. Use
the appropriate adaptor provided in the kit.
Connect the Self-Contained Water Bottle Tubing
Refer to the instructions included with the water bottle.
Connect the Foot Control (A-dec 541 only)
To attach the foot control to a cabinet:
1. Route the foot control tubing through the subbase.
Bracket
Posts
Floor Mount
A-dec 541/545 Delivery Systems
Flow diagram is under
round worksurface.
Flow diagram is inside
control head housing.
CAUTION
When removing or replacing
covers, take care not to damage any wiring
or tubing. Verify that the covers are secure
after replacing them.
NOTE
A-dec provides sufficient tubing
length for a remote mount foot control.
Opening for
Cover Removal
Power Supply
Indicator Light
Opening (optional)
Foot Control
Tubing Opening