Bakers Pride BCO-G Installation And Operating Instructions Manual - page 2
Table of Contents
A
Receiving
2
B
Set Up / Mounting
3
C
Installation with Casters (Optional)
4
D
Location and Minimum Clearances
4
E
Gas Connections
4
F
Electrical Connection
5
G
Flue Connection Ventilation
5
H
Burner Operation
6
I
System Check Rotary Control
6
J
Programming Menus
6
A
General Instructions
7
B
Operation Sequence Rotary Control
7
Cook only rotary control
7
Timed cooking rotary control
7
Cook and hold- rotary control
7
Optional steam injection rotary control
8
To cool down the oven quickly
8
C
Cleaning
8
D
Servicing
8
Stacking Instructions
9
Leg Assembly Instructions
10
Wiring Diagrams
11, 12
Parts List & Exploded View
13
I. INSTALLATION INSTRUCTIONS
II. OPERATING INSTRUCTIONS
SECTION
ITEM
PAGE
Warranty
16
2
I. INSTALLATION INSTRUCTIONS
A. RECEIVING
B. SET UP / MOUNTING:
NOTE:
Read the notice on the outside carton regarding damage in transit. Damage discovered after opening
the carton is “CONCEALED DAMAGE.” Carrier must be notified immediately to send an inspector and
to furnish forms for claims against the carrier.
When the oven arrives, it should consist of:
A crate or carton containing your new oven (two for a stacked unit).
A carton containing four 31” legs with mounting hardware (set of four 6” legs is supplied for stacked
installations).
A carton containing a Flue Adapter and a Draft Hood. Optional: for Direct Venting (Not available for
EuropeanCommunity Countries).
This appliance must be installed by competent personnel in accordance with the rules in force.
In the U.K., Corgi registered installers (including the regions of British Gas) undertake to work to safe
and satisfactory standards. This appliance must be installed in accordance with the current Gas Safety
(Installation and Use) Regulations and the relevant Building Regulations/IEE Regulations. Detailed
recommendations are contained in the British Standard Codes of Practice B.S. 6172, B.S. 5440: Part 2
and B.S. 6891.