BarAid 500 Installation And Operation Instructions Manual - Start-Up
8
1617-A-01-09
dE
GB
F
nl
4.4 soFtEnER
(only on option)
For the first run, the softener has to be filled with regeneration salt
and potable water.
Filling the salt reservoir with cleaning agent will damage
the water softener.
Open the door.
Unscrew the softener lid and fill the softener with 2 kg of "Granular
regeneration salt" (do not use salt tablets).
Fill up the softener with potable water (only at the first run).
clean seal and rim of softener lid carefully, before closing the lid.
Close lid and tighten.
In order to prevent corrosion it is necessary to remove any
salt residues from tank bottom.
adjust the water hardness according to chapter 9.3 !
When the salt indicator
➅
illuminates during operation, the softener
has to be refilled with regeneration salt.
There will be a slight delay before salt light extinguishes after refill.
–
–
–
–
–
–
–
5.1 pREpaRatIon
Check correct position of wash/rinse arms and strainers.
open shut-off valve.
switch on main switch or put the plug in.
Check level of detergent and rinse aid containers.
Close door and push the on/oFF button
➀
, tank will be filled.
The on/oFF button flashes green during fill and heating cycle. This
process can take several minutes.
When the button changes to green steady burning light, machine is
ready for operation.
–
–
–
–
–
–