Farymann Diesel 15B Series Operator's Manual - page 36
Diesel engine Series 15B / 18B
Installation and commissioning
36
2008-09-08
Pos: 6.1 /KN2006-SM/Installation & Inbetriebnahme/001 1 Installation und Erstinbetriebnahme_Titel @ 9\mod_1144393592402_2.doc @ 86334
6 Installation and commissioning
Pos: 6.2 /KN2006-SM/nL---------- Abschnittsende ---------- @ 8\mod_1141997892953_0.doc @ 75473
Pos: 6.3 /KN2006-SM/Installation & Inbetriebnahme/002 1.1 Sicherheit_Titel @ 9\mod_1144395122392_2.doc @ 86369
6.1 Safety
Pos: 6.4 /KN2006-SM/Installation & Inbetriebnahme/003 1.1.0 Personal --> Standard --> ggf. anpassen @ 12\mod_1144395266192_2.doc @ 86376
Personnel
Installation and commissioning may be executed only by
specially trained personnel.
All work on the electrical system must be performed by a
qualified electrician.
Pos: 6.5 /KN2006-SM/nL---------- Abschnittsende ---------- @ 8\mod_1141997892953_0.doc @ 75473
Pos: 6.6 /KN2006-Projekte/Bukh-Farymann/Installation und Inbetriebnahme/1.1 Installation2032 @ 48\mod_1191325974338_2.doc @ 636992
6.2 Installation
Pos: 6.7 /KN2006-Projekte/Bukh-Farymann/Installation und Inbetriebnahme/Schwungrad anbauen 6415 @ 54\mod_1196686152882_2.doc @ 836308
6.2.1 Mounting the flywheel
Must only be performed by a specialist.
Additional protective equipment required:
z
Safety footwear
Special tool needed:
z
Torque wrench
Fig. 10
NOTE!
Always check the flywheel nut with a torque
wrench for 216 to 226 Nm before every
installation in or attachment to the machine.
1.
Install engine on suitable mounting.
2.
Turn engine slowly with the crank handle until the keyway (1)
in the crankshaft (3) faces upwards.
NOTE!
This position makes installation of the flywheel
easier.
3.
Place both plate washers (2) on the crankshaft (3).
NOTE!
The flat sides of the plate washers face each other.