Gardena FP 1000 Operating Instructions Manual - 4. Initial Operation
11
GB
B
Putting into operation
as a stream pump :
The stepped nipple (½
" / ¾" )
6
can be used for connection, for
example, to a stream or source stone.
1. Release the catches
A
and remove the filter bowls
B
.
2. Screw the T-piece
7
onto the adapter
1
.
3. Screw the stepped nipple
6
onto the side outlet of the
T-piece
7
.
4. Screw the cap
8
onto the T-piece
7
.
4. Initial Operation
Note : In the event of an uneven foundation, the fountain can be
vertically aligned with the adjustable ball joint
2
.
1. When using a gargoyle, connect the hose of the gargoyle
to the stepped nipple
6
.
2. Place the pump with the fountain on a firm base so that the
filter housing
9
is completely covered by water.
3. Undo the fixing nut
D
of the ball joint
2
,
place nozzle tube
3
vertically and screw
fixing nut
D
tight again.
4. Connect the mains plug of the pump to
an A.C. socket.
Attention : pump starts immediately.
5. Unscrew Water Bell, Fleur-de-Lis or
Water Jets out of the nozzle tube
3
until
the fountain has the required shape.
6. Adjust the size of the fountain with the
regulating valves
5
.
7. Adjust the required amount of water of
the gargoyle with the regulating valves
0
.
Note : When using a ¾
" hose, the front part of the stepped
nipple can be cut off with a saw.
1. Connect the hose of the stream to the stepped nipple
6
.
2. Place the pump with the stepped nipple
on a firm base so that the filter housing
9
is completely covered by water (max. 2 m
under water).
3. Connect the mains plug of the pump
to an A.C. socket.
Attention : pump starts immediately.
4. Adjust the required amount of water with
the regulating valves
0
.
B
Installing the set as a
stream pump :
A
Putting into operation
as a fountain pump :
9
9
3
D
6
6
2
0
0
5
8
6
1
7
A
B