Haier AB092FCBHA User Manual - Introduction
15
Preparation
Voltage: single-phase1PH,220-230V**50Hz
The power source must be grounded.
Connection parameters: H05RN-F*
Signal parameters:
Tools for installation
Following materials are prepared by the owner:
Following are necessary tools for installation:
1
2
3
60mm drill
4
5
.
Screw drivers (normal,
Philips-head and tricorn)
.
Hacksaw
.
.
Socket screw wrench
.
Adjustable spanner
6
(14
17
19
24 and 27mm)
7
8
9
.
Spanne
*
*
*
.
Pipe cutter
.
Expander
.
Knife
10
11
12
13
14
.
Pliers
.
Leak tester and
soap solution
.
Steel tape
.
Scraper and file
.
Refrigeration
oil(polyol ester)
Code
Material
1-side adh-
esive tape
Connection
hose
Water-proof
insulation
material
Gesso
2-sided
adhesive
tape
A
B
C
D
E
Drainage
hose
F
Power supply requirements:
Cables for power supply, connection and signals are prepared by the owner.
Connection
duct dime-
nsions
Specifications
Liquid pipe
Gas pipe
AB092FCBHA
Copper tube option
AB142FCBHA
O 9.52(3/8")
O 6.35(1/4")
O12.7(1/2")
O 6.35(1/4")
2
3G(1.0-1.5)mm
H05RN-F*
2X(0.75-1.5) mm
2
*
Shielded wire
*
Electrical cables should be connected by ìYî method. Damaged or wornelectrical cable
must be replaced by authorized after sales agents.
A circuit breaker must be installed
The power plug should be connected as follows: L for live line, N for neutral line and
fo
r
grounding.
Dedicated electrical cable(30A)should be installed by a qualified technician in accordance
with the state regulation for electrical engineering.
AB182FCBHA
O15.88(1/2")
O 9.52(1/4")