La Spaziale S1 Vivaldi II Owner's Manual - page 6
S1 Vivaldi II Owner’s Manual
Be sure you connect the included water hose to the threaded water inlet on the bottom
vious since there is only one place it can
hich connects to the water supply - may
Contact your VII dealer for advice if the solution isn’t obvious. Also, your VII dealer may
ur water hardness is below a certain level to ensure long
. If
of the machine. Proper connection is ob
attach. The opposite end of the hose - w
require adapters from your local hardware store depending on your specific situation.
request that you check that yo
life and trouble free operation. Hardness test strips may be included for this purpose
your water fails this test, contact your VII dealer and discuss the available options.
Once water supply is properly attached, turned on, and the desired basket has been
inserted into one of the portafilter handles, attach the portafilter to the group. Be sure
that the drip tray is installed by sliding it into place at the bottom front of the machine.
3.3 Turning On and Heating the Machine
1) Insert the plug into the 110V AC socket, the On/STBY light (22) starts flashing.
(Stand-by mode).
2) Press the
ON / OFF
(27) button and keep it pressed for about 3 seconds, the
green On/STBY light (22) changes from flashing to steady indicating the mac
is ON. At the same time the lights from (14) to (21) turn on steadily for about a
second (indicating power on test mode).
hine
he
oon as the temperature reaches 91°C (turning on of light 14) and
boiler temperature drops under the set
3) The light corresponding to the set temperature starts flashing to indicate that t
group is heating and the automatic boiler refill starts until the water level preset
by the manufacturer is reached.
4) Once the filling process is finished, the BOILER light (13) starts flashing to
indicate that the boiler is heating. However, after first switching on, the boiler
doesn't work until the group has reached the set temperature.
5) Fasten the portafilter handle (11) to the brewing group (10).
6) Wait until the set temperature is reached, by checking that the lights on the
control panel (9) gradually turn on as the temperature rises. The visualization
starts as s
continues until the machine has reached its operating temperature (light from
flashing to fixed).
7) When the group has reached the set temperature, the boiler heating starts
(BOILER light (13) flashing), once it reaches the set temperature the light
becomes fixed.
8) Every time the group temperature or the
value, the respective light starts flashing (heating phase) until the set
temperature is reached.
9) The machine is now ready.
Page 4