Lanier R/C BF109 Building Instructions - Warbird Combat
Warbird Combat
Assembly instructions
20
6. Fit the pushrod in the fuse and exit
the slot. Install a 2-56 nut and clevis
on the end of the rod. Hook the cle-
vis to the elevator horn.
7. Center the elevator servo and
make sure the elevator is centered.
Mark the wire where it crosses the
elevator arm on the servo and bend
up at a 90 degree angle. Cut off at
3/8”.
8. Fit the pushrod in the arm and
retain with the nylon snap-r-keeper.
bamboo skewer
Two bamboo skewers are included to
stiffen the stab. Insert one into the
flute in the coroplast just in front
of the hinge line. Push it all the way
in, it will extend past the center of
the stab. Go to the other side and go
1 flute forward of the one on the
other side so they will not hit in the
middle. They will overlap in the cen-
ter, one in front of the other. This
will add strength to the center sec-
tion. The bamboo varies a lot in diame-
ter. If too tight you may have to sand
a little then tap into place with a
hammer. If loose just apply glue and
insert and let the glue dry.