Table 2.
Dipswitch Settings
Colour
Cycle Time
10+9+1
Red
Static
10+9+2
Green
Static
10+9+3
Blue
Static
10+9+4
Amber
Static
10+9+5
Cyan
Static
10+9+6
Magenta
Static
Note: The following settings are best achieved when using the Ledion
Ultra products fitted without optics, which are more suitable for
precise short throw colour mixing.
Dipswitch Settings
Colour
Cycle
10+9+7
Warm White
Static
10+9+8
Cool White
Static
Page 13
Fig 1.4 Shows a typical set up for the Ledion LUS12, LUS24 or LUS36 the
fixtures are connected to the LUD36 power supply with RJ45 data
cables into the LUT (tee piece), (see fig 1.4) the fixture is then plugged
into the port marked LED, the cable coming from the LUD36 is plugged
into the port marked IN the cable to the next fixture is plugged into
the port marked OUT. When you come to the last fixture an LUC/EL
should be used in place of the tee as you do not need to carry on to any
other fixtures, the LUC/EL can be used for the end of the line or as an
in line connector to extend data cables.
3 x LU12’s (2 x LUT, 1 x LUC/EL)
1 x LU24 (connected directly)
1 x LU24 + 1 x LU12 (1 x LUT, 1 x LUC/EL)
1 x LU36 (connected directly)
NOTE. The cable run must be terminated (i.e. have no open sockets on
the tee pieces or connectors.)
Warning. The Max Cable run to the fixtures on each
LUD36 should not exceed 20m.