Figure 5.
4. Repeat the previous process (Figure 4) to install sections 3 and 4 (Figure 5).
MEDICAL GAS CONNECTIONS
Medical gas outlets are pre-manifolded and terminated near the top of each section, or as indicated on the
approved drawings.
1. Use extreme care in making medical gas service connections.
2. Each single-point connection has been provided with a color-coded medical gas label.
3. All medical gas connections are to be made and tested in accordance with NFPA 99.
ELECTRICAL CONNECTIONS
1. Make sure all electrical power circuits are locked off prior to hook up.
2. Review wiring diagram or shop drawing.
3. All connections are labeled on the unit at the point of connection.
4. Connect electrical service according to wiring diagram, being careful to observe labeling at service connection
junction boxes.
5. For back-fed units, proper installation of wiring bushing plates is essential for proper grounding continuity
between headwall and rough-in template.
a. Feed wiring from template junction box through the bushing plate into the headwall junction box.
b. Secure bushing plate to the template junction box using 6-32 machine screws (provided).
c. Secure bushing plate to the headwall junction box using four #8 self-drilling screws (provided).
6. Test equipment in accordance with NFPA 70 (The National Electrical Code), in addition to any applicable state