4. To be completed by the installer
On behalf of the installer, I hereby confirm that:
We have completed the installation in accordance with the Installation Manual;
the POD Point has been connected to the electricity supply and commissioned;
the installation has been tested for electrical safety;
the above commissioning details are true and accurate.
Name:............................................................................
Position .................................................................................................................
Date:.............................................................................. Compny:…………………………………………………......................
Please send this certificate, with Sections 1-4 completed, to Installations@pod-point.com.
5. Activation Details
Date POD entered into PPMS
Date Whitelist updated
Date Configuration updated
Firmware version
Date POD activated
6. To be completed by POD Point
We hereby confirm that:
The POD Point has been installed and commissioned;
The above commissioning details are true and accurate.
Name:.............................................................................
Position ..............................................................................
Date:..........................................................................
Any Additional Notes