Other items not supplied, but that may be required:
t
M10 or M12 x 120 mm (minimum) countersunk security anchor bolts x 4 (surface mount only, suitable for local
substrate)
t
5 mm steel rod (for stabilising subterranean foundation during installation only)
t
RS115 NAL socket (NAL adapter only)
t
Feeder Piller
Section 1.2: Assembly/Installation Tools
Tools required:
Torque wrench (min. 8 – 30 Nm)
Bit adapter
Security Torx Bits
Drill and masonry bit to suit anchor bolts (surface mount and guards only)
Hammer (surface mount only)
Spanner or socket (surface mount only)
Spirit level
Assembly Procedure summary
1. Installation foundation, foundation adapter and power supply (see sections 2 and 3)
2. Install power post onto foundation adapter
3. Insert 3 x M10 securing screws and tighten to 30 Nm
4. Remove red cover from power distribution box
5. Connect power supply
6. Replace red cover on power distribution box
7. Insert fuse(s) (supplied with the power head) and affix the appropriate rating label to the fuse holders. Note for 13/32
models (PP_2111) the 16A fuse MUST be installed in the right hand fuseholder.
8. Install power head
8.1 Insert the power head onto the post (make sure that the face of the head is pointing the right way, that the internal
brackets align with the slots in the post and that the rubber seal is correctly located over the post)
8.2 Connect power plugs (1x4 way and 1 x3 way)
8.3 Connect 1 x 8-way control plug
8.4 Check all connectors for dislodged pins and security
8.5 Install 3 x M6 security screws and tighten to 8 Nm (roll up the seal to access fixing holes)
9. Affix the large data plate label supplied with the head to the back of the power post, so that
........
the base of the label is170mm from ground level (see image A).
10. Carry out the testing and commissioning as defined in Section 4
A