POD Point PP_2111 Installation Manual - Introduction
POD Point Twin charge is the next generation in electric vehicle charging for local councils and corporate clients
looking to join the electric vehicle revolution. Inexpensive and simple to install, it minimises the increase in street
furniture and offers a level of management and control not seen before through the POD Point Communication
Network.
Each POD Point can charge two vehicles simultaneously, which significantly reduces the effective cost per charging
socket.
All POD Points use industry-standard foundations and electrical connections – making them extremely easy to install
and connect using existing contractors with minimal additional training.
This document gives an outline of what is required for installing a POD Point from a civil and electrical perspective.
Introduction
Installation Guide
Section 0: Before you begin 2
Section 1: Contents of Box 3
Section 2: Civil Work
5
Section 3: Electrical Work 6
Section 3.1: Dedicated supply direct onto main 7
Section 3.2: Extension to existing supply 8
Section 4: Final connect up & commissioning the Installation 9
Appendix A: Commissioning Handover Certificate 10
Appendix B: Troubleshooting 11
Appendix C: Signage, Bay markings and guards 12
Contents