Sussman ES Installation, Operation And Maintenance Manual - page 2
Sussman Boilers
Installation, Operation & Maintenance Manual
Dimensional Information & Component Identification
2
___________________________________________
WATER
STEAM
MODEL
H
W
L
INLET
OUTLET
___________________________________________
ES 12, 18; HU 40–55
36"
20"
28"
1/2” NPT
1/2”NPT
___________________________________________________
ES 24–72; HU 75–205
44"
23"
33"
1/2”NPT
1” NPT
___________________________________________________
ES 100; HU 310
59"
28"
34"
1/2”NPT
1 1/2”NPT
___________________________________________________
ES 135–180; HU 410–550 61"
30"
36"
1/2”NPT
2” NPT
___________________________________________________
SSB 12–18
36"
20"
28"
1/2”NPT
1/2”NPT
___________________________________________________
SSB 24–72
45"
27"
33"
1/2”NPT
1” NPT
___________________________________________________
SSB 80–100
59"
28"
34"
1/2”NPT
1 1/2”NPT
___________________________________________________
SSB 135–180
61"
30"
36"
1/2”NPT
2” NPT
___________________________________________
Allow minimum 21 inches clearance in front of door for servicing of heating
elements. Recommended clearance: 24 inches all around boiler for servicing.
H
H
L
W
Models: ES, HU, SSB
_______________________________________
SYMBOL ITEM
ES12-18
ES24-72
ES100 ES135-180
_______________________________________
Height
Overall Height
36"
44"
59"
61"
________________________________________________________________________
Length
Overall Length
28"
33"
34"
38"
_________________________________________________________________________
Width
Overall Width
20"
22"
26"
30"
_________________________________________________________________________
A
Steam Outlet
6-1/4"
10"
8-1/4"
9"
_________________________________________________________________________
B
Steam Outlet
10-1/4"
17"
17-1/4"
18-1/4"
_________________________________________________________________________
C
M/M Drain Valve
5"
12"
17"
16-3/4"
_________________________________________________________________________
D
M/M Drain Valve
6-1/2"
6"
6-1/4"
6-1/4"
_________________________________________________________________________
E
Check Valve
14"
9"
17"
16-3/4"
_________________________________________________________________________
F
PV Drain Valve
2-3/4"
2-1/4"
2-3/4"
2-3/4"
_________________________________________________________________________
G
PV Drain Valve
6-1/4"
9-1/2"
7-3/4"
9-1/4"
_________________________________________________________________________
J
Clearance
3-3/4"
3-1/2"
4"
4"
_________________________________________________________________________
K
Check Valve
2-1/2"
2-3/4"
3"
3"
_________________________________________________________________________
M
Door Width
8-3/4"
14"
12-3/4"
14-3/4"
_________________________________________________________________________
Allow 24 inches all around for servicing.