Cut surface material large enough to accommodate the remote cable connector and board area
leaving sufficient surface material to attach panel with #8 mounting screws.
8.3.1
Route the 10-ft. interface cable (011486) from the remote panel
mounting area to the inverter being careful to avoid unprotected sharp
corners or moving parts.
8.3.2
Turn off inverter, and then plug the interface cable into the inverter's
front panel “Remote/IFM1” connector. Verify that dip Switch 4 is set to
Remote. Plug the other end of the cable into the remote panel.
8.3.3
Mount the remote panel using two #8 screws.
9 SYSTEM START-UP AND TESTING PROCEDURES
WARNING:
THESE PROCEDURES ARE TO BE PERFORMED ONLY BY A
QUALIFIED INSTALLER.
After the inverter has been properly mounted with sufficient ventilation, DC cables have been connected,
AC wiring has been completed, and all remote connections have been checked, the Start-up and Testing
procedure may now be performed.
9.1 INVERTER START-UP AND TESTING
1.
Place the System On/Off switch on the inverter in the OFF position.
2.
Place the Load Demand switch on the front panel, Switch 1, to the ON position to test Load
Demand function. It can be changed later if this feature is not preferred.
3.
Place the Wet/Gel Setup switch to the correct position for the installed battery type.
4.
Verify that the external breakers and GFCI receptacle is reset and connect an AC load, such as a
100-Watt light.
5.
Connect both battery cables to battery and turn on the battery DC power to the inverter (if battery
switch is used).
6.
Do not connect shore/utility (generator) power at this time.
7.
Place the System On/Off switch on the Inverter panel to the ON position.
8.
Place the System On/Off switch on the Remote panel (if used) to the ON position.
9.
Plug AC output test light (e.g. 100 watt trouble light) into 15A convenience receptacle and turn on to
verify inverter produces AC power and the Load Demand function allows the unit to power up from
stand-by mode. Applying any AC load greater than 5 Watts should wake up the inverter from Load
Demand “stand by” mode.
10.
Connect and activate AC shore/power (or generator).
11.
When shore/utility power (or generator) has been connected the inverter the following should occur:
If AC test light is off.
•
Inverter Light will blink slowly
•
Charge Bulk or Charge Float mode Lights will illuminate. (If the battery is fully charged, it
will advance from Bulk mode to Float mode after a time delay).
If AC test light is on.
•
Inverter Light will blink.
•
Battery charge stage Lights will illuminate as described above.
•
The AC output test light should be on, indicating the presence of shore power and correct
operation of the AC Transfer switch.