Waterway NEO 2100 Instruction Manual

Other manuals for NEO 2100: Instruction Manual

Summary of NEO 2100

  • Page 1

    Spa control system instruction manual 807-1930.0114 ©2014 waterway plastics 2200 east sturgis road, oxnard ca 93030 • phone 805.981.0262 • fax 805.981.9403 waterway@waterwayplastics.Com • www.Waterwayplastics.Com designed, engineered & manufactured in the usa. 12:34 pm 104°f 1.

  • Page 2: Warning!

    Warning! Qualified technician required for service and installation basic installation and configuration guidelines • use minimum 6awg copper conductors only. • readily accessible disconnecting means to be provided at time of installation. • permanently connected power supply. • connect only to a ci...

  • Page 3: Warning!

    Caution! Csa compliance / conformitÉ • test the ground fault circuit interrupter before each use of the spa. • read the instruction manual. • adequate drainage must be provided if the equipment is to be installed in a pit. • for use only within an enclosure rated csa enclosure 3. • connect only to a...

  • Page 4: Priming Mode

    Main screen: the main screen displays current time, water temperature, and status of the system accessories. The screen below from bottom, left to right indicates light on, blower on, jet 1 at low speed, and jet 2 at high speed. Priming mode: when power is on, the system will enter a priming mode wi...

  • Page 5: 100°F

    Menu navigating: • menu button: use to enter setting menu and sub-menu screens. For screens with several settable fields (example: date-time screen), use menu button to navigate between different fields within the screen. • up and down button: use to navigate between different options or changing va...

  • Page 6: Rotate View

    Rotate view special temp heat mode filter cycles date-time panel timeout: if user is in setting menus and no button is pushed within 15 seconds, the screen will timeout, current screen setting will be lost and panel reverts back to main screen. In main screen, if no buttons is pushed within 60 minut...

  • Page 7

    Setting screens: • rotate view: rotate the view 180 degrees, the up and down button also swap when rotated. With rotate view highlighted press menu to enter rotate view setting. Use up/down to select the desire setting and return to exit and confirm the setting. • special temp: to temporarally heat ...

  • Page 8

    Insufficient flow press return to clear low flow press return to clear water overheat press return to clear heater overheat press return to clear potential freeze press return to clear plumbing error press return to clear error screens: error caused when sensor 1 and sensor 3 have been plugged in in...

  • Page 9: Wiring Diagram

    Wiring diagram (without daughter board) 3 a material f nish h rd angle project on act wt calc wt see notes see notes authorize: engineer: mfg eng: prd mgr: draw by: approval date: np 04/11/14 descriptions: p/n: rev. Basic controller diagram a rev. Eco # 00 drawn/date check/date approved/da e nitial ...

  • Page 10: Wiring Diagram

    Wiring diagram with daughter board (db1) material finish third angle projection act wt calc wt see notes see notes authorize: engineer: mfg eng: prd mgr: draw by: approval date: np 12/23/13 descriptions: p/n: rev. Basic controller diagram a rev. Eco # 00 drawn date check/date approved/date initial r...

  • Page 11: Wiring Diagram

    Wiring diagram with daughter board (db2) material f nish third angle project on act wt calc wt see notes see notes authorize: engineer: mfg eng: prd mgr: draw by: approval date: np 08/23/13 descriptions: p/n: rev. Basic controller diagram a rev. Eco # 00 drawn/date check/date approved/da e nitial re...

  • Page 12: Wiring Diagram

    Wiring diagram xxxxxxxxx) material finish third angle projection act wt calc wt see notes see notes authorize: engineer: mfg eng: prd mgr: draw by: approval date: np 08/23/13 descriptions: p/n: rev. Basic controller diagram a rev. Eco # 00 drawn/date check/date approved/date initial release per eco ...