Wayne-Dalton Torquemaster 9100 Installation Instructions And Owner's Manual - page 7
Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer,
refer to your local yellow pages business listings or go to the Find a Dealer section online at www.Wayne-Dalton.com
Place the center jamb bracket over the lower hole of the hole/ slot pattern that is centered
between the bottom jamb bracket and flag angle of the 2nd hole set. Secure jamb bracket
using (1) 1/4”-20 x 9/16” track bolt and (1) 1/4”-20 flange hex nut. Repeat for other side.
If a top jamb bracket was included, secure it to vertical track using the lower hole of the hole/
slot pattern in the 3rd hole set and (1) 1/4”-20 x 9/16” track bolt and (1) 1/4”-20 flange hex
nut. Repeat for other side.
F.A. jamb
bracket
1/4”- 20 x
9/16”
Track bolt
1/4”- 20
Flange hex nut
Jamb bracket
in place
1st hole set
Lower hole of
hole/ slot pattern
Vertical track
2nd hole set
3rd hole set
Top of track
Windload Jamb Brackets
Tools: None
6
NOTE: Windload specification 0356 only uses the (Q.I.) jamb bracket schedule.
NOTE: The following (JB-1) denotes a slotted jamb bracket.
Measure the length of the vertical tracks. Using the jamb bracket schedule, determine the
placement of the jamb brackets for your door height and track length. Loosely fasten the
jamb bracket to the vertical track with (1) 1/4”-20 x 9/16” track bolt and (1) 1/4”-20 flange
hex nut. Repeat for other side.
(JB-1) JAMB BRACkET SCHEDuLE
Door height
No. of sections
No. of jamb brackets
(each jamb)
Location of center line of
jamb brackets measured
from bottom of track (all
dimensions ±2”)
WINDLOAD SPECIFICATION 0228
7’-0” or Less
4
1
2” (JB-1), 63” (JB-1)
7’-1’’ to 8’-0”
4 or 5
1
2” (JB-1), 34” (JB-1)
WINDLOAD SPECIFICATION 0229, 0600, 0602, & 0606
7’-0” or Less
4
2
25-1/2” (JB-1),
63”(JB-1)
7’-1’’ to 8’-0”
4 or 5
2
23” (JB-1), 34” (JB-1)
WINDLOAD SPECIFICATION 0235, 0236, 0237, 0604, & 0609
7’-0” or Less
4
3
2” (JB-1), 25-1/2” (JB-
1), 63”(JB-1)
7’-1’’ to 8’-0”
4 or 5
3
2” (JB-1), 23” (JB-1),
34” (JB-1)
WINDLOAD SPECIFICATION 0230, 0232, 0233, 0234, 0601, 0603, 0605, 0607, & 0608
7’-0” or Less
4
4
2” (JB-1), 25-1/2”
(JB-1), 34” (JB-1), 63”
(JB-1)
7’-1’’ to 8’-0”
4 or 5
5
2”(JB-1), 23” (JB-1),
34” (JB-1), 58” (JB-1),
75” (JB-1)
Jamb bracket
(1) 1/4”- 20 X 9/16”
Track bolt
(1) 1/4”- 20
Flange hex nut
Vertical track
Attaching Struts
Tools: Power Drill, 7/16” Socket Driver, Tape Measure
7
NOTE: Refer to door section identification, located in the pre-installation section of this
manual or refer to Parts Breakdown on page 2.
NOTE: Larger doors will have color coded struts. A 18 gauge (.046) strut will have red ends.
A 20 gauge (.034) strut will have blue ends.
NOTE: If your door’s windload option code is 0356, skip to the For The Windload Option Code
0356 section of this step for strut attachment.
FOR THE BOTTOM SECTION:
1.
If your doors windload option code begins with 06, place the strut with the notched
ends over the bottom rib of the bottom section with the notches facing down. Center the
strut left to right on the section surface.
If your doors windload option code begins with
02, place the strut with the notched ends over the bottom rib of the bottom section with
the notches facing down. The ends of the strut will fit in between the bottom corner bracket
flanges and the bottom section rib. Center the strut left to right on the section surface.
2. Fasten the strut at each ends through the top flange with (1) 1/4”-14 x 7/8” self drilling
screw.
If your doors windload option code begins with 02, then also fasten the strut at
each ends to the bottom section rib with (2) 1/4”-14 x 5/8” self tapping screws, through the
two holes in the bottom corner bracket flanges.
3. Place (2) 1/4”-14 x 5/8” self tapping screws through each pre-punched hole at each
center hinge(s) location.
4. Place the strut over the top rib of the bottom section with the eight pre-punched holes,
facing up. Center strut left to right on the section surface. Attach the strut at each ends
through the struts bottom flange with (1) 1/4”-14 x 7/8” self drilling screw.
5. Finish securing the struts to the section, by placing (2) 1/4” -14 x 5/8” self tapping screws
midway between the end of the door and the center hinge(s) locations and (1) 1/4”-14 x 5/8”
self tapping screw approximately eight inches from each end.
Strut
Top rib
Bottom rib
Bottom section
Strut with
notched ends
Pre-punched holes
facing up
End
hinge
Bottom corner
bracket
Bottom
section
Strut with notched ends
Strut
End
hinge
Center hinge
Bottom corner bracket
1/4”-14 x 7/8”
Self drilling screw
1/4”-14 x 5/8” Self tapping screws
(2) 1/4”-14 x 7/8” Self drilling screws
FOR THE LOCk, INTERMEDIATE AND TOP SECTIONS:
1. Place the strut over the top rib of each of the remaining sections with the (8) pre-punched
holes at the ends, facing up. Center the strut left to right on the section surface.
2. Fasten the strut(s) at each end through the top and bottom flange with (2) 1/4”-14 x 7/8”
self drilling screws.
3. Place (2) 1/4”-14 x 5/8” self tapping screws through each center hinge(s) locations.
4. Finish securing the strut(s) to the section by placing (2) 1/4”-14 x 5/8” self tapping screws
midway between the end of the door and the center hinge(s) locations and (1) 1/4”-14 x 5/8”
self tapping screw approximately eight inches from each end.
FOR THE WINDLOAD OPTION CODE 0356:
1. Place the strut over the top rib of the bottom section. Center the strut left to right on the
section surface. Fasten the strut at each end with (2) 1/4”-14 x 5/8” self tapping screws,
through the top and bottom flanges of the strut as well as (2) 1/4”-14 x 5/8” self tapping
screws at all center hinge locations and midway between center hinge locations and the end
of the strut.
2. Attach the strut to the top rib of the intermediate section for a four section high door and
the top rib of the intermediate and intermediate II sections for a five section high door, in the
same manner the strut was attached to the bottom section.
7