Webasto Air Top Evo 40 Installation Instructions Manual - 10 Initial Operation
21
Air Top Evo 40 | Air Top Evo 55
10 Initial operation
10.1 Information on initial operation
10.2 Checking operation with Webasto
Thermo Test PC Diagnosis
Correct operation of the heater can be checked with the Webasto
Thermo Test PC Diagnosis.
X
X
Check heater in stable operation for approx. 15 minutes with
the diagnosis monitoring function.
10.3 Starting up
3
3
Heater is fully installed.
X
X
Make sure the control unit cover is fitted in position.
X
X
Install contact guard if necessary.
X
X
Bleed fuel supply system using Webasto Thermo Test PC Dia-
gnosis.
X
X
Switch on the heater via the control element (see control ele-
ment operating instructions).
10.4 Starting up system with two units
3
3
Master heater and slave heater are fully installed and connec-
ted.
X
X
Switch on the master heater via the control element (see con-
trol element operating instructions).
To confirm correct connection of two heaters to form a system,
both heaters switch once to ventilation mode.
10.5 Product registration
X
X
Register the product on the internet under: http:// dealers.
webasto.com
X
X
Hand over the registration document to the next owner or
user of the unit.
X
X
Carefully read through the heater operating instructions and
the safety information within.
WARNING
Breathing exhaust fumes in closed rooms
Poisoning and suffocation
X
X
Never operate the heater (also not with program-
med heating start) in closed rooms such as gara-
ges or workshops that do not have an exhaust ext-
raction unit.