Yamaha 2012 Griizzly 700 YFM7FGPB Owner's Manual - page 141
8-59
8
2. Connect the positive battery lead first, then
connect the negative battery lead by installing
their bolt. NOTICE: When installing the bat-
tery, the main switch must be off, and the
positive lead must be connected before
the negative lead.
[ECB01110]
3. Install the battery holding plate by installing
the nuts.
4. Install the front carrier by installing the bolts
and tightening them to the specified torques.
5. Install the panel.
EBU30520
Replacing a fuse
1. Positive battery lead (red)
2. Negative battery lead (black)
1
2
Tightening torques:
Carrier bolt (top):
34 Nm (3.4 m·kgf, 25 ft·lbf)
Carrier bolt (under the fenders):
7 Nm (0.7 m·kgf, 5.1 ft·lbf)
1. Fuse box
2. Main fuse
3. EPS fuse
4. Fuel injection system spare fuse
5. Fuel injection system fuse
U1HP10E0.book Page 59 Thursday, March 24, 2011 4:11 PM