Yamaha 2012 Griizzly 700 YFM7FGPB Owner's Manual - page 95
of
174
8-13
8
To install the panel
1. Place the panel in the original position, and
then install the quick fasteners.
2. Install the front carrier stays by installing the
bolts and tightening them to the specified
torque.
3. Install the front carrier by installing the bolts
and tightening them to the specified torques.
1. Panel B
2. Quick fastener
Tightening torque:
Front carrier stay bolt:
34 Nm (3.4 m·kgf, 25 ft·lbf)
U1HP10E0.book Page 13 Thursday, March 24, 2011 4:11 PM