Zenith Victoria Pavilion Assembly Instructions Manual - Hardware Pack 2
AA 1/4" - 20×1 hex bolt
8 PCS
72 PCS
16 PCS
32 PCS
16 PCS
16 PCS
CC
1/4" - 20×0.6 hex bolt
DD 1/4" - 20×0.6 bolt
EE 1/4" - 20×2.125 bolt
FF
1/4" - 20 hexagon nut
Hardware Pack 2
Fig.5: Attach the Top short panel (M2) to the Top long panel (L2) with bolts (AA) & washers (BB).
Fig.6: Attach the Top slanting bar (A2) to the Corner connector (G1) with bolts (EE) & washers (BB) & nuts (FF).
Fig.7: Attach the Top slanting bar (A2) to the assembled small top frame with bolts (CC) & washers (BB).
Fig.8: Attach the Middle beam of big top B2 (C2) to the assembled Middle beam connector E1 with bolts (EE),
washers (BB) and nuts (FF).
Fig.8-1: Connect the Middle beam of big top C2 and the assembled small top frame M2 with bolts (CC)&washers (BB).
Fig.8-2: Attach the Middle beam of big top B2 to the assembled small top frame L2 with bolts (CC) & washers (BB).
Fig.9: Connect one end of the Left long support beam of big top long side (D2) and the Middle beam of big top (B2),
fasten with bolt (DD) & washer (BB).
Fig.10: Attach the other end of the long support beam (D2) to the Top slanting bar (A2) with bolts (DD) & washers (BB
Use the same way to assemble E2, F2, G2, H2, I2, J2, and K2 respectively.
P4
ALUMINUM HARDTOP GAZEBO ASSEMBLY INSTRUCTION
BB
AA