Zenith Victoria Pavilion Assembly Instructions Manual - page 9
IMPORTANT:
1.
Keep
all
children
and
pets
away
from
assembly
area.
Children
and
pets
should
be
supervised
when
they
are
in
the
area
of
pavilion
construction.
2.
The
area
for
assembly
should
not
be
less
than
6
feet
from
any
obstruction
such
as
fence,
garage,
house,
overhanging
branches,
laundry
line
or
electrical
wires.
3.
This
unit
is
heavy.
Do
not
assemble
this
item
alone,
six people
are
recommended
for
safe
assembly.
4.
Some
parts
may
contain
sharp
edges.
Wear
protective
gloves
if
necessary
during
assembly.
5.
When
assembling
and
using
this
product,
basic
safety
precautions
should
always
be
followed
to
reduce
the
risk
of
personal
injury
and
damage
to
equipment.
Please
read
all
instructions
before
assembly
and
use.
6.
For
outdoor
use
only.
Install
on
level
ground.
16
stakes
are
provided
to
secure
the
pavilion
in
the
ground.
If
you
wish
to
secure
the
pavilion
to
a
wood
deck
surface,
you
will
need
to
purchase
fasteners
appropriate
for
these
surfaces.
These
are
readily
available
at
your
local
hardware
store
or
home
center.
7.
Check
all
bolts
for
tightness
before
and
during
usage.
8. Please check your state and local
regulations
prior
to
purchasing. Some
jurisdictions
may
require
permits
for,
or
otherwise
regulate,
installation
and
use.
9.
While
this
pavilion
is
manufactured
to
withstand
gale
force
winds
utilizing
only
the
supplied
ground
stakes,
in
areas
subject
to
frequent
severe
weather,
securing
the
pavilion
to
a
deck,
concrete
patio
or
footings
should
be
considered.
10.
Your
pavilion
has
been
engineered
to
accommodate
winter
snow
loads
incurred
in
most
areas.
Removal
of
accumulated
snow
on
the
pavilion
roof
with
a
roof
rake
is
recommended.
In
areas
that
are
regularly
subject
to
blizzard
conditions
however,
removal
of
the
roof
panel
is
suggested.
The
assembled
roof
structure
can
simply
be
left
intact
until
warmer
conditions
return.
Fig.24: Attach
the
roof
covers
C5,
D5,
E5,
F5,
H5,
I5,
J5,
K5
to
the
top
slanting
bar
(A2)
with
bolts
(DD)
&
washers
(BB).
Fig.25: Press
up
the
roof
cover
with
the
roof
press
sheet
(N5),
and
fix
N5
on
the
decorative
beam
with
bolt
(DD)
&
washer
(BB).
Fig.26: Insert
the
top
cover
(L5)
into
the
hole
of
the
small
top
frame
corner.
Fix
the
top
cover
(L5)
on
the
top
slanting
bar
(A2)
with
bolts
(GG)
&
washers
(BB).
P8
ALUMINUM HARDTOP GAZEBO ASSEMBLY INSTRUCTION
Now, your Sunoma Pavilion is ready for use.
Fig.28
Fig.29
Fig.27:
Fig.28: :
DD
DD
DD
DD
BB
BB
BB
BB
Fix the netting bar O1( O2) to the decorative
washer (BB).
beam A1,B1(C1,D1) by using bolt (DD) and flat
A1(C1)
B1(D1)
O1(O2)
O1(O2)
Fig.29
Hang Mosquito netting (P1) on the inside
netting bar (O1 &O2) by using the
pipe of
on the outside pipe in the same way.
Mosquito netting hook (P3), hang the Wall (P2)
P1
P1
P2
P2
Fig.29
-1
&
Fig.29
-1
:
P3
O1(O2)
P2
P1