4 Reinstall the screw on the standoff.
5 Reinstall the cover and the cover screws.
CAUTION: The DIP switches should all be in the down position. The
DIP switches are accessible through an opening on the side of the
chassis.
6 If the bridge/router was mounted with brackets, reinstall the brackets
and remount it.
7 Reconnect the power cord and all cables.
DIP switches should all
be in the down position
Install screws