reSOlving errOrS
20
PLEASE NOTE:
The internal DC fault current detector (if present) conducts a self-test
before each charging procedure: In case of an error, the respective error
sequence will be shown (see page 18).
Proceed as follows to test the RCCB:
1. Open the cover shield of the Wallbox using the key supplied.
2. Locate the button engraved
T
or marked
Test
.
3. Press the button: The RCCB should now trip and flick the pivot lever of the RCCB
into a centre position (connection to the power supply is interrupted).
4. Switch the circuit breaker completely off (
0
position) and then back on by flicking
the pivot lever up into the
I
position.
5. Lock the cover shield of the Wallbox again.
Danger!
Should the RCCB malfunction during testing, you must not continue
to operate the Wallbox under any circumstances!
Please contact your local distributor from whom you have purchased the
Wallbox.
Taking the device out of operation
If required, you can take your Wallbox temporarily or permanently out of operation. To
deactivate your EVSE 5X1 / 5X3 temporarily, please proceed as follows:
1. Open the cover shield using the key supplied.
2. Flick the pivot lever of the internal RCCB (if present) into the
0
position (connection
to the power supply is interrupted).
3. Lock the cover shield again.
Now the EVSE 5X1 / 5X3 cannot be used for charging.
To deactivate your Wallbox permanently, please proceed as follows:
1. Open the cover shield using the key supplied.
2. Flick the pivot lever of the internal RCCB (if present) into the
0
position (connection
to the power supply is interrupted).
3. Lock the cover shield again.
4. In addition, switch off the miniature circuit breaker (MCB) in your upstream domes-
tic power distribution box (position
0
).
Now the EVSE 5X1 / 5X3 is completely free of electricity and may be demounted if
required.