CAME ZLJ24 Installation Manual - page 3
L
N
E
+
-
E
10 11 TS E
ES 1
2
3
4
5
CX CY CZ
7
2
FA2 FC2
FA1 FC1
+
-
M1
M2
N1
N2
ENC1
ENC2
L2T
L1T
L2T
L1T
24 12
0
24 12
0
B1 B2
S1 GND
1
2
5
7
3
4
6
8
9
16
15
15
14
13
12
21
20
19
18
18
17
10
14
11
26
0V
17
0
230V
26
0V
17
0
230V
1
B
A
GND
22
23
p.
33
- M
an
u
al
c
od
e:
F
A
0
0
0
3
8
-E
N
F
A
000
3
8
-E
N
v
.
33
- 0
2
/2
0
17 - © C
am
e S
.p.
A
. - T
h
e m
an
u
al
's c
onte
nts m
ay b
e e
d
ite
d at a
ny ti
m
e w
ith
ou
t n
oti
ce
.
GENERAL INSTRUCTIONS FOR INSTALLING
Only skilled, qualified staff must install this product.
Before working on the control panel, cut off the main current supply and, if present, remove any batteries.
Preliminary checks
Before installing the control panel, it is necessary to:
• make sure that the point where the control panel is fastened is protected from any impacts and that the anchoring surface is solid enough,
and that proper tools are used (screws, anchors, etc.); • make sure you have set up a suitable dual pole cut off device along the power supply
that is compliant with the installation rules. It should completely cut off the power supply according to category III surcharge conditions (that is,
with minimum contact openings of 3 mm);
• Make sure that any connections inside the container (ones that ensure continuity to the protection circuit) are fitted with additional insulation
compared to those of other electrical parts inside.
Description of parts
1. Transformer
2. Power supply on warning LED
3. Display
4. Programming
buttons
5. Display brightness adjusting trimmer
6. Programming warning LED
7. Memory roll board connector
8. Connector for the R700 card
9. AF card connector
10. Antenna terminal
11. Transponder terminals
12. Endstop terminals
13. Terminals for control and safety devices
14. Terminals for gearmotors
15. Encoder terminals
16. Power supply terminals
17. Line fuse
18. Motor fuse
19. Electric lock fuse
20. Control board fuse
21. Accessories fuse
22. RSE board connector
23. CRP connection terminals