D-Link DSN-1100 User Manual - page 83
xStack Storage Management Center Software User’s Guide
73
4. When the message in Figure 5-4 tells you that the event history file has been saved
successfully, click OK to remove the message.
Figure 5-4. Event History File Save Message
5.2.2 Viewing Scheduled Activities (Schedule Tab)
The Schedule tab in the System Administration View lets you view, suspend, or delete
activities that you have scheduled. Each row in the tab corresponds to an activity that has
been scheduled. Examples of activities that can be scheduled include volume scanning,
volume reconfiguration, and downing of a drive. The tab provides Suspend, Cancel, and
Delete buttons for suspending, canceling, or deleting scheduled activities.
To suspend a scheduled activity, click the activity and click the Suspend button. The
Suspend button toggles to Resume for this activity. To resume a suspended activity,
click the activity again and click the Resume button.
To delete a scheduled activity, click the scheduled activity and click the Delete button.
To cancel a scheduled activity that is being performed or is suspended, click the activity
and click the Cancel button. If the task is set to recur, this procedure only cancels the
current operation. To cancel all future occurrences of the activity, use the Delete
button to delete the scheduled task.