Pre-commissioning checks
7
Operation and Commissioning
NOTE!
Information about operating the unit via the
Kampmann room controller can
be found in the separate instructions.
Structural tests:
Has the unit been safely installed mechanically?
Have the accessories and casing been installed safely?
Has the transport protection been removed from the
impeller?
Electrical tests:
Is the cable laying in accordance with the applicable
regulations done?
Are all cores according to electrical wiring diagrams hung up
and wired?
Is the protective continuous conductor connected and wired?
Water-side checks:
Have
the
fl ow and return pipes been connected properly?
Have the valves been correctly installed? (Note the
permissible fi tting position of the actuators!)
Have all valves and actuators been fi tted correctly?
Are the shut-off valves on site open?
Condensation drain (only for units with a cooling function):
Has the condensation drain been checked with water
introduced for the test run?
Before the initial commissioning, clean the condensation
trays and remove dirt and construction dust.
Check the fi lter:
Before the initial commissioning, check that the fi lter is clean
and replace it accordingly if dirty.
Transport protection:
Has the transport protection been removed from the
fans? (see page 26).
7.1 Pre-commissioning checks
Kampmann GmbH can also perform a functional
check (optional). For contact details please refer to
Chapter 1.4 "Customer Service" on page 5.
DANGER!
Check before initial commissioning whether all
necessary conditions have been met so that the unit
can function safely and properly.