Keba KeContact P20 Installation Manual - page 21
Installation
21 / 48
It is important to ensure that the connection cable is inserted through the center of the double
membrane seals to ensure the correct sealing of the device.
Flush-mounted box
Cable outlet
A double flush-mounted box with separating
divider for secure separation can be provided
for the cable insertion.
[A]
… mains supply line
[B]
… control line
[C]
… Ethernet
4.3 Mounting the charging station
Installation materials
The included installation material is suitable for cement, brick and wood (without anchors).
For other surfaces, a suitable method of installation must be selected.
Depending on the device model or in case of special materials, the mounting materials must
be made available on site.
A proper mounting is absolutely necessary and lies outside of the scope of responsibility of
KEBA AG.
Please also observe the following manufacturer instructions:
Instructions for placing anchors and bolts. Source: Fischer