Pacific Energy FP30AR Installation And Operating Instructions Manual - page 11
PACIFIC FP30 261114-28
11
©PACIFIC ENERGY FIREPLACE
PRODUCTS LTD.
FP30 &
FP30AR
42"
[1.07m]
47"
[1.19m]
30 3/4"
[781mm]
9 5/8"
[245mm]
34 7/8"
[886mm]
23"
[584mm]
27 1/2"
[699mm]
13 1/4"
[337mm]
23 7/8"
[606mm]
30 1/8"
[765mm]
Dimensions
Procedure:
The fi replace should be in place before framing.
Note: See "Combustion Air" section on page 17.
MAINTAIN CLEARANCES TO COMBUSTIBLES AS
SPECIFIED IN THE INSTALLATION INSTRUCTIONS
CAUTION: THE STRUCTURAL INTEGRITY OF THE
FLOOR, WALL AND CEILING/ROOF MUST BE MAIN-
TAINED.
THE SPACE HEATER MUST BE CONNECTED TO A
FACTORY-BUILT CHIMNEY CONFORMING TO CAN/ULC-
S629 AND UL 103HT STANDARDS FOR 650C FACTORY-
BUILT CHIMNEYS.
1. Position fi replace and fl oor protection in accordance with
the clearances as stated on the label and in these instal-
lation instructions.
2. Mark the position for the hole for the chimney in the ceil-
ing and roof by using a string and plumb-bob.
3. Check that the intended location will not interfere with fl oor
joists, ceiling joists or rafters before proceeding further.
Follow the chimney manufacturer's instructions.
4 Assemble the framing kit as per instructions on page 13.
Secure the framing kit to the top of the unit with three
#8X1/2"(13mm) sheet metal screws (Fig.#5) or use steel
studs to frame from the fi replace to the ceiling. The framing
kit should be 1/8"(3mm) proud of the front of the fi replace.
Frame in the fi replace in accordance with the framing
clearances stated on page 12. Anchor the Framing kit to
the wood framing on the sides and top.
NOTE: Combustible materials cannot be used in the
space directly above the fi replace. No material can be
used or placed in the space above the unit with the
exception of approved framing materials.
When the unit is in its fi nal location, it must be secured to
the fl oor through the holes provided in the base plate. Use
four #10 x 3/4" screws.
FIG. #6
FIG. #5
The fi replace must not be in contact with any insulation
or loose fi lling material. Cover the insulation with drywall/
sheetrock panels around the fi replace.