Pacific Energy FP30AR Installation And Operating Instructions Manual - page 20
20
PACIFIC FP30 261114-28
©PACIFIC ENERGY FIREPLACE
PRODUCTS LTD.
FIG. #18
3. Locate the Remote Blower Assembly in the desired wall
or ceiling location, maximum 20’(6.1m) away from the
unit, and secure to the framing.
NOTE: THE REMOTE HEAT KIT BLOWER/S CAN BE
INSTALLED SO THAT ANY EDGE OF THE GRILL IS A
MINIMUM 12"(305mm) FROM THE CEILING, FLOOR OR
ANY OTHER SURFACE.
4. Attach the 10”(254) X 3 1/4”(83mm) Transition Boot to
the Remote Blower Assembly and seal with aluminium
duct tape. Run a 6”(150mm) diameter approved Type “B”
venting between the blower and the fi replace. Fasten in
place with screws and seal with aluminium foil tape.
5. Locate the make-up air inlet in a desired location in the
chase wall.
6. Attach fi nishing grills over both inlet and outlet using the
screws provided.
Electrical Wiring
NOTE: ALL ELECTRICAL WIRING MUST BE DONE BY A
QUALIFIED ELECTRICIAN.
Consult local codes or, in the absence of local codes,
with the current CSA C22.1 Canadian Electrical Code
and in the USA with the National Electrical Code, ANSI/
NFPA 70 (Latest Edition).
The Optional Remote Heat blower electrical rating: 120V,
60HZ, 80 watts. For your protection against shock hazard,
use only a properly grounded power supply.
This kit includes a junction box, rheostat and cover plate.
The junction box should be mounted in a convenient location
away from the fi replace.
NOTE: THE REMOTE HEAT KIT BLOWER/S SHOULD BE
WIRED TO A SEPARATE SWITH OR SPEED CONTROL-
LER THAN THE CONVECTION BLOWERS ON THE UNIT.
SPEED
CONTROL
BLOWER
120 VOLTS
60 Hz
0.7 AMPERES
G (green)
L1 (white)
L2 (black)
BLOWER ASSEMBLY
HEAT DUCT
TRANSITION BOOT
FIG. #19
USE ONLY COPPER CONDCUTORS