Pacific Energy PACIFIC FP30 Installation and operating instructions manual - page 11
PACIFIC FP30 060514-28
11
FP30
45"
1.14m
44"
1.12m
30 3/4"
781mm
11 1/4"
286mm
21 7/8"
556mm
28 1/8"
714mm
29 1/2"
749mm
25"
635mm
33 3/8"
848mm
8"
203mm
Dimensions
Clearances to combustible surfaces and materials are shown
on pages 14,Fig.#10 & page 17 Table #1.
Clearances may be reduced with various heat insulating
materials. Consult local, National fi re codes and authorities
for approval.
Procedure:
Note: See "Combustion Air" section on page 18.
MAINTAIN CLEARANCES TO COMBUSTIBLES AS
SPECIFIED IN THE INSTALLATION INSTRUCTIONS
CAUTION: THE STRUCTURAL INTEGRITY OF THE
FLOOR, WALL AND CEILING/ROOF MUST BE MAIN-
TAINED.
THE SPACE HEATER MUST BE CONNECTED TO A
FACTORY-BUILT CHIMNEY CONFORMING TO CAN/ULC-
S629 AND UL 103HT STANDARDS FOR 650C FACTORY-
BUILT CHIMNEYS.
1. Position stove and fl oor protection in accordance with the
clearances as stated on the label and in these installation
instructions.
2. Mark the position for the hole for the chimney in the ceil-
ing and roof by using a string and plumb-bob.
3. Check that the intended location will not interfere with fl oor
joists, ceiling joists or rafters before proceeding further.
Follow the chimney manufacturer's instructions.
4 Assemble the framing kit as per instructions on page 13.
Secure the framing kit to the top of the unit with three
#8X1/2"(13mm) sheet metal screws (Fig.#6) or use
steel studs for the entire vertical section. The framing kit
should be fl ush with the front of the fi replace. Frame in
the fi replace in accordance with the framing clearances
stated on page 12. Anchor the Framing kit to the wood
framing on the sides and top.
5. Remove the rear standoffs from the fi rebox and attach to
the unit with the 45 degree cut facing to wards the rear
of the unit as shown in Fig. #6
FIG. #7
FIG. #6
NOTE: Combustible materials cannot be used in the space
directly above the fi replace. No material can be used or
placed in the space above the unit with the exception of
approved framing materials.
The fi replace must not be in contact with any insulation
or loose fi lling material. Cover the insulation with drywall
panels around the fi replace.
Rear
Standoffs