Wacker Neuson RCE Operator's Manual - page 32
Maintenance
RCE
32
Operator’s manual
8
Maintenance
8.1
Maintenance schedule
WARNING
Improper handling can result in injury or serious material damage.
f Read and follow all safety instructions of this operator's manual, see chapter
Safety information.
WARNING
Electrical voltage.
Injuries from electrocution.
f Remove the plug from the plug receptacle before all work on the machine.
Task
Daily
before
operation
As
required
Every
2 years
Check power cable for perfect
condition – if power cable is
defective, have it replaced.*
* Have these tasks carried out by the service department of your Wacker
Neuson contact person.
Visual inspection of all parts
for damage.
Check knife for wear – if
necessary, replace knife.
Check screws on machine for
tightness – if necessary,
tighten them.
Check the hydraulic oil tank
level for power loss or leaking
hydraulic oil – if necessary
add hydraulic oil.
Change hydraulic oil.