WEG SSW-08 User Manual - page 17
Manual is about: Soft-Starter
of
55
3
Installation and Connection
12 | SSW-08
Line
Circuit-breaker
Fuses
T
S
R
R/1L1 S/3L2 T/5L3
U/2T1 V/4T2 W/6T3 PE
PE
PE
Figure 3.4: Standard power/grounding connections
3.2.1 Power Terminals
The power connection terminals can be of different sizes and configurations depending on the
Soft-Starter SSW-08 model as shown in figures 3.5 and 3.6.
Terminals :
R / 1L1, S / 3L2 and T / 5L3: AC supply line.
U / 2T1, V / 4T2 and W / 6T3: Motor connection.
Output
Power Terminal
Input
Power Terminal
Output
Power Terminal
Input
Power Terminal
Models 17 A to 85 A
R/1L1 S/3L2 T/5L3
R/1L1
S/3L2
T/5L3
U/2T1
Models 130 A to 412 A
V/4T2
W/6T3
Figure 3.5: Power terminals