18)
Move the Test Lead Selector Switch to Lead 2.
19)
Repeat steps 5 through 8 for lead 2, and save the data in the tester’s memory as was
done in step 12.
20)
Move the Test Lead Selector Switch to Lead 3.
21)
Repeat Steps 5 through 8 for Lead 3 and again save the data in the testers memory as
was done in step 12.
Note:
A good way to check the wave patterns after the test is complete is to display all three
wave patterns at once. To do so, press the function key that corresponds to Recall. Press the
Up and/or Down keys to bring the cursor to the desired Record and press the key that
corresponds to Summary. Stored data for all three lead locations appear on the display along
with any recorded HiPot data.
Single coil surge test and set-up
Note:
Check to ensure there is nothing connected to the coil or winding being tested. This is
extremely important when testing installed coils or windings. Test inaccuracies will result and
can be hazardous to personnel performing tests.
1)
With the test lead select (TLS) switch in the leads ground position, make the following
connections. Refer to the Test Lead Connections table present earlier in this chapter for
lead information.