Eaton Compass sit-to-stand Installation manual - page 13
13
Compass sit-to-stand
Installation Manual
COMPASS SIT-TO-STAND INSTALLATION MANUAL
Eaton.com/compass
SECTION III – Assembling the desk
cont’d.
Install Cable Chain kit
•
The kit parts are designed to allow attachment to either the
left or right leg of the assembled desk Location was pre-
determined in sections A, B & C
•
Place outer cable channel against lift column 1" above
foot (large holes facing away from column) Slide cable
chain strap around column and thru large opening in
outer channel - slide stud slot over threaded stud in outer
channel Thread (1) ¼-20 acorn nut (I) to stud capturing
strap Do not tighten Locate tab slot in strap, place over
outer channel tab To retain tab in slot, assemble inner
channel section over tab, attach using (2) ¼-20 acorn
nuts (I) Do not tighten
•
Side outer channel down to top of foot – aligning tab in
outer channel and slot in foot Pull cable chain strap and
tighten all acorn nuts using
3
⁄
8
hex socket with extension
•
Ensure that rubber flap is in place on cable channel inner
section Tuck rubber flap inside channel
•
Attach work surface bracket to pre-drilled holes using
(2) #10 x 1" Phillips pan head screws (A).
•
Mount cable chain to cable channel using (2) # ¼-20 x
3
⁄
8
button head screws (G), (2) #¼-20 acorn nuts (I).
COMPLETED
ASSEMBLY
Foot
Large hole
in channel
Cable channel
outer section
Cable
chain
#10 x 1"
screws
1
⁄
4
-20 Button
head screws
1
⁄
4
"-20
Acorn Nut
Worksurface
bracket
Tab on
channel
Worksurface
bracket
Cable
chain
strap
Tab slot
Stud slot
Cable channel
inner section
Rubber flap