N&W Global Vending Koro Prime Espresso Installation, Operation & Maintenance Manual - Cleaning and Filling
© by N&W GLOBAL VENDING S.p.A.
6
01-2016 4875 00
Chapter 1
Cleaning and filling
maiN
switc
A main switch outside the machine is intended to power
off the machine.
Attention !!!
The line cable terminal board, the fuses and the
interference suppressor remain anyway live.
Door
switc
When the door is open, you are not allowed to ac-
cess any live part.
Ordinary filling and cleaning operations can be carried
out in fully safe conditions.
upp r
paN l
switc
When the upper panel is open, you are not allowed
to access any live part.
Ordinary filling and cleaning operations can be carried
out in fully safe conditions.
All the operations requiring the machine to be
directly connected to a source of electricity must
be only carried out by the personnel qualified and
informed on the specific risks involved.
2
3
4
5
6
7
8
9
10
11
13
14
15
16
17
18
1
12
Fig. 3
1- Liquid waste tray
2- Tiltable cup support
3- Milker nozzle (models with cappuccinatore)
4- Milk tube (models with cappuccinatore)
5- Nozzle support
6- Brew unit
7- Door switch
8- Milk froth cock (models with cappuccinatore)
9- Coffee funnel
10- Grinding regulation knob
11- Decaff coffee chute (on some models only)
12- Upper panel
13- Coffee beans canister
14- Coffee canister shutter
15- Instant powder canister
16- Mixer
17- Nozzle support release button
18- External main switch