Pacific Energy NEO 2.5 Installation And Operating Instructions Manual - page 13
110714-24
NEO25 13
FIG. #8
Chimney
Storm collar
* 4"(102mm) diameter air inlet with rodent screen
* If the crawl space is well ventilated it is not necessary
to extend air inlet to outside
Spark arrestor
rain cap
Radiation shield
Chimney Connector
44.5" (1130 mm)
Minimum
Minimum 7' (2.1m.)
Ceiling Height
Attachment to fl oor for
mobile homes
Non-combustible
fl oor protector
48"
(1219 mm)
3' (914 mm)
Minimum
Hooded vent or
90 elbow turned down
The chimney may incorporate
an offset. To do this safely, all
sections of listed connector,
offset elbows and chimney
section must be screwed
together by at least three
sheet metal screws per joint.
The chimney must be suitably
supported by the chimney
manufacturer's listed offset
support.
Procedure:
CAUTION: THE STRUCTURAL INTEGRITY OF THE MOBILE
HOME FLOOR, WALL AND CEILING/ROOF MUST BE
MAINTAINED.
- The services of a competent or certifi ed installer, (certifi ed
by the Wood Energy Technical Training program (WETT) - in
Canada, or the Hearth Education Foundation (HEARTH) - in
U.S.A.,) are strongly recommended.
Note: See "Combustion Air" section on page 10.
1. Position stove and fl oor protection with hole for combustion
air in accordance with the clearances as stated on the
label and in Figure #7.
2. Mark the position for the hole in the ceiling and roof by
using a string and plumb-bob.
3. Check that the intended location will not interfere with fl oor
joists, ceiling joists or rafters before proceeding further.
4. Cut a hole in the ceiling and roof to suit the chimney
system and frame in the sides. The chimney support is
mounted to the framing.
5. If the chimney connector exits the mobile home less then
7 feet above the ground then a guard must be installed
to cover the connector up to a height of 7'(2.1m).
6. The guard must not have opening larger than 3/8"(9.5mm)
and must maintain a space of 4"(102mm) minimum around
the chimney
connector.
7. Assemble chimney sections so the fi nished length is resting
on the support and protruding through the roof. Avoid
having joints between ceiling and roof. Install radiation
shield. Assemble fl ashing and storm collar and be sure to
maintain the vapour barrier at this point. (Seal securely.)
Attach rain cap and check fl ashing for leaks.
8. Install connector as per manufacturer's instructions.
9. Attach stove to fl ooring using two 1/4"(6mm) x 2"(51mm)
or longer lag screws.
Unit may be harder to start.
Please provide as much verti-
cal length for the fi rst section
of pipe as possible.
*
*