Protherm 100 Manual for instruction and use

Other manuals for 100: User Instructions
Manual is about: wall mounted combination boiler

Summary of 100

  • Page 1

    Floorstanding cast iron boiler cascade conection possible output up to 150 kw grizzly en v e r z i o n xxxx - v.2 4/2005 manual for i n struction and use of boiler 65, 85, 100, 130, 150 klo protherm spol. S r.O. Jurkovičova 45 909 01 skalica tel.: 034 6966 101 fax: 043 6644 017 www.Protherm.Sk.

  • Page 2

    2 3 dear client, you have just become an owner of a klo / klo eko (grizzly) natural gas or propa- ne gas fired cast iron boiler. We are con- fident that you will be satisfied with the service this boiler will give you. Howe- ver, you’ll have to comply with at least minimum requirements when running the...

  • Page 3

    4 5 stn 34 0350 – stn electrical engineer- ing regulations. Regulations for loose ca- bles and cords. Stn 33 1500 – instructions for electrical equipment. Stn en 60 335-1 – safety of household and similar electrical appliances. Part 1 – general requirements. D ) chimney: stn 73 4210 – construction o...

  • Page 4

    6 7 the protherm klo boiler consists of the following components: 1. Cast iron body of the boiler with thermal insulation and water connection pipe sec- tion; 2. Burner plate with gas connection route and ignition device; 3. Collector of combustion fumes with a chimney thrust detector and skkt ther-...

  • Page 5

    8 9 is automatically ignited. It is ignited by an ignition spark and its flame is detected by an ionisation electrode. After the ignition burner has steadied up and the ionisation circuit closed, the main gas supply valve to the main burner opens. If the ignition burner does not ignite within a safet...

  • Page 6

    10 11 of view, it is recommended that a reservoir is installed near the building to be heated, and refilled by an authorised organisa- tion. Adequately sized propane supply from the reservoir to the boiler and to other gas appliances will then be part of the design and delivery of the reservoir. When...

  • Page 7

    12 13 before final installation of the boiler, the heating system distribution pipes must be flushed several times by pressurised wa- ter. In old, already used systems, this is done in the opposite direction to the heat- ing water flow. Boiler’s location if there are special requirement on ma- nipulati...

  • Page 8

    14 15 1 2 3 4 5 6 7 8 9 10 11 12 13 14 albatros rva63.242 is an equithermal control unit designed for serial connection to the source of heat with: • one or two-stage burner, 1bmu • hot water supply pump or hot water he- ating bypass valve • one or two heating circuits with a three- -point blender d...

  • Page 9

    16 17 operator’s duties in addition to setting the control elements (including control unit), the operator must: 1) comply with the local operating mode – lom (or, if one has not been devised yet, proceed in accordance with operat- ing instructions for each device and its components (for the boiler,...

  • Page 10

    18 19 er applicable regulations. Incorrect use of the boiler might result in reducing its life, but also in damages to health and prop- erty. Starting the boiler up the boiler the functioning of which has al- ready been verified by the first live test is started up as follows: – set the heating water ...

  • Page 11

    20 21 the protherm klo/klo eko gas-fired boilers are covered by a warranty speci- fied in the warranty certificate, service book and the conditions defined in these operating instructions. Warranty and warranty terms and conditions completeness of the delivery delivery of the actual boiler the protherm ...

  • Page 12

    22 23 assembling the boiler after delivery the boilers series klo / klo eko are for transportation reasons delivered with the thrust breaker installed in a horizontal position. After the boiler has been deliv- ered to the point of installation, the thrust breaker must be installed in the operating p...

  • Page 13

    24 25 the top cover can be removed after the two self-cutting screws located at the back of the boiler have been removed. When the screws have been removed, lift the cover upwards. The boiler’s control panel front can be dismantled after removing the two self- cutting screws in the panel’s top corne...

  • Page 14

    26 27 ching kit of the equithermal control unit. Check the connector and make sure that it has not interconnected for instan- ce also an additional opposite pin. 5. Insert the remaining terminal boxes into the equithermal control unit as shown in the relevant schematic diagram (pages 37 – 39). 6. In...

  • Page 15

    28 29 preparing and starting up the boiler before actually starting up the boiler, the following basic tasks have to be carried out: a) fill up the heating system with water. Check the water pressure on the boiler’s pressure gauge. B) check the boiler’s connection to the fu- mes exhaust system, c) o...

  • Page 16

    30 31 row in the adjusting valve a flat screwdriv- er and turn it by 180°. When running the boiler on propane gas, the arrow must be pointing in the direction of gas flow. When running the boiler on natural gas, the ar- row must be pointing in the opposite direc- tion to gas flow. 7. When converting th...

  • Page 17

    32 33 uring point is situated on the burner plate console. 5. Start up the boiler. 6. Let the operating pressure on the burn- er stabilise for a while before starting the adjustment. 7. Take orientation reading of the gas pressure (the values must correspond to the values specified in table x). 8. Re...

  • Page 18

    34 35 leg end of sc hematics see on pa g e 36 tc signalizace 2 1 c po1 t4a hv t ermostat bojleru prostorový regulátor 8 7 6 5 tb/c tb1 1 4 2 18 3 l pr1 n pr2 ~230v 50hz ptt op n 17 15 14 16 13 l dt1 sp v2` èervená tl1 10 zap a lo v a cí automa tik a iono 1 2 3 4 5 11 honeywell s4560b 1048 dt2 Èerp. ...

  • Page 19

    36 37 legend to schematic electric diagrams for the 65 - 150 klo / klo eko boilers hv - main switch po1 - power mains fuse pt-top - heating operation controls tl1 - fault reset button, reset dt1 - red glow tube - fault indication control dt2 - orange glow tube - overheating indication control ht - e...

  • Page 20

    38 39 sc hematics of the boiler klo / klo ek o and thermostat r v a63.280 sc hematics of the boiler klo / klo ek o and thermostat r v a 63.242.