Quadra-Fire 5100 ACC Installation Manual - page 6
6
7047-910
October 14, 2013
5100 I-ACC
ATTENTION INSTALLER:
Follow this Standard Work Checklist
Thisstandardworkchecklististobeusedbytheinstallerinconjunctionwith,notinsteadof,theinstructionscontainedinthisinstallationmanual.
Customer:
Date Installed:
Lot/Address:
Location of Fireplace:
Installer:
Dealer/ Distributor Phone #:
Serial #:
Model (circle one):
51I-ACC
WARNING! Risk of Fire or Explosion! Failuretoinstallfireplaceaccordingtotheseinstructionscanleadtoafireorexplosion.
Appliance Install
Verifiedclearancestocombustibles.(Pg.8)
Fireplace is leveled and liner is secured to appliance. (Pg. 18)
Hearthextensionsize/heightdecided.(Pg.22)
Outside air kit installed. (Pg. 15)
Floor protection requirements have been met.
Themasonrychimneyisinspectedbyaprofessionalandiscleanorthe
factory built metal chimney is installed according to the manufacturer’s
instructions and clearances.
Chimney Section 4 (Pg. 10)
Chimneyconfigurationcomplieswithdiagrams.
Chimney installed, locked and secured in place with proper clearance.
Chimney meets the minimum height requirements.
Roofflashinginstalledandsealed.
Terminationsinstalledandsealed.
Clearances Section 3 (Pg. 7)
Combustible materials not installed in non-combustible areas.
Verifiedallclearancesmeetinstallationmanualrequirements.
Mantels and wall projections comply with installation manual requirements.
Protective hearth strips and hearth extension installed per manual requirements.
Appliance Setup Section 5 (Pg. 15)
All packaging and protective materials removed.
Firebrick,baffleandceramicblanketinstalledcorrectly.
All labels have been removed from the door.
Allpackagingmaterialsareremovedfrominside/underthefireplace.
Manualbagandallofitscontentsareremovedfrominside/underthefireplace
and given to the party responsible for use and operation.
Hearth & Home Technologies recommends the following:
•Photographingtheinstallationandcopyingthischecklistforyourfile.
•Thatthischecklistremainvisibleatalltimesonthefireplaceuntiltheinstallationiscomplete.
Comments: Furtherdescriptionoftheissues,whoisresponsible(Installer/Builder/OtherTrades,etc.)andcorrectiveactionneeded:
Comments communicated to party responsible by on
(Builder/Gen.Contractor) (Installer)(Date)
Part#4017-254•RevB•01/29/13
YES IF NO, WHY?
F. Install Checklist