SmartSight S1000-RX 1 User Manual - page 10
4
CHAPTER 3 S1000 System Configuration and Installation
3.1 S1000 system configuration
Your S1000 system is configured to operate right out of the box with the most
popular dome data port configurations (4800 baud, 8 data bits, no parity, 1 stop bit).
For added security, we recommend you change the SSID to your own secret SSID
and activate the WEP encryption and change the WEP key to your secret WEP key
before installing the system.
STEP 1 Initial Configuration
• Unpack the modules and set them side by side on a desk or table.
• Unpack the 2 cable assemblies (P/N S1000-CA-9P) and connect them to the
module (you must feel a positive click for the cable assembly connector to be
properly installed on the module)
• Connect the S1000-TX cable assembly DB-9 to a computer (if the DB9 has
been removed, refer to the table below to connect conductors properly) and
power the module (the STATUS LED should turn steady green and then
flashing green under normal operation; see the next section to understand
how this LED behaves under different operation conditions)
S1000-CA-9P TO PC CONNECTION
S1000 Cable Assembly Serial Port Description
(DCE port)
Computer
(DTE)
SIGNAL NAME
WIRE PAIR
WIRE COLOR
SIGNAL NAME
CTS
GREEN Not
used
RxD
GREEN/
BLACK
BLACK RX
TxD
YELLOW TX
RTS
YELLOW/
BLACK
BLACK Not
used
Signal GND
BROWN Signal
GND
Signal GND
BROWN/
BLACK
BLACK
Signal GND
NOTE: Power the unit via the cable assembly RED & BLACK conductor
pair. The RED conductor is for 12 VDC input (or 24VAC if this
option was purchased) and the BLACK conductor is for the power
GROUND (or 24 VAC return if this option was selected).